Skip to content

SYSTEM Cited by 2 sources

Atlassian MCP server

What it is

The Atlassian MCP server (also called the Atlassian Rovo MCP server) is Atlassian's hosted, remote MCP server at https://mcp.atlassian.com/v2/mcp. One server spans the Teamwork Collection — systems/jira, Confluence, Loom, Goals/Projects — so one agent session can cross products, with the resulting links landing in the Teamwork Graph. Reported scale: >15M tool calls every weekday and ~2M MAU, up 8× since March 2026 (Source: sources/2026-10-28-atlassian-jiras-depth-on-demand-designing-an-mcp-server-around-jobs).

Tool-surface design (v1 → v2)

  • v1 (MVP): 15 Jira + 13 Confluence + a few shared tools, near-1:1 with REST endpoints; 32 definitions (~60 KB JSON, ~15k tokens) loaded up front; creating an issue took four calls; terse descriptions.
  • v2 (job-first): 52 Jira tools that call 100+ distinct APIs, chosen from user requests, usage rankings (reads and writes ranked separately), and dogfooding — instead of auto-generating tools for Jira's ~725 REST operations. Canonical patterns/tool-surface-minimization instance.
  • Server-side orchestration: e.g. manageJiraSprint resolves the tenant's story-point custom field, updates estimates, adds issues via the Agile API, and starts the sprint in one call; getJiraBoardSprintData resolves board + active sprint by name and returns progress slices.
  • Schema tactics: enum action parameters; names instead of IDs; descriptions that say when to use a tool and point to neighbours; errors with the faulting field, allowedValues, and a repairHint; JQL passthrough; view = compact/evidence/full.
  • Workflow-preserving writes: closing an issue = listJiraIssueTransitions then transitionJiraIssue, so Jira validators and conditions still run.

Context loading

Six core tools are always loaded; the other 46 are deferred, found through discover, and run through executeRead, executeWrite, or executeDestructive, so each call's risk tier is explicit (concepts/progressive-capability-disclosure). ?tools=all returns a flat catalog for MCP gateways. Reported: up to 25% fewer tokens than v1; full up-front loading ≈ 2.2× the cumulative input tokens of the deferred design (concepts/context-window-as-token-budget).

Authorization and governance

Evaluation

Outcomes are judged by final Jira state, not agent self-report. October 2026 internal 84-case eval: 17 new tasks enabled; 57/62 vs 54/62 on shared cases; failed tool calls per run 0.20 → 0.09. Failing cases are kept as jobs-to-be-done evals to steer improvements.

Seen in

Last updated · 854 distilled / 2,448 read